LACONWAP GREEN ENERGY
Active Development SEC CS202060596

8 MW Laconwap 3
Mini-Hydro Power
Project

Laconwap Green Energy Inc. (LGEI) is developing an 8.0 MW run-of-river hydroelectric power facility across Nagtipunan, Quirino and Dupax del Norte, Nueva Vizcaya — powering Northern Luzon with 38.5 GWh of clean, renewable energy annually.

0 MW
Rated Capacity
0 m
Gross Head
0 GWh
Annual Energy
$0 M
Investment Facility
Laconwap 3 MHPP Google Earth Scheme
Project Location

Google Earth Satellite View

Laconwap River intake at 600m ASL flowing to powerhouse at 445m ASL through a 2.7 km penstock

Run-of-River
Est. 2020
Rated Capacity 8.0 MW
Turbine Type Francis
Gross Head 155 m
Net Head 148 m
Design Flow 7.0 m³/s
Annual Energy 38.5 GWh
Penstock Length 2,700 m
Catchment Area 67 km²
Turbine Efficiency 92%
Generator Efficiency 95%
Rated Capacity 8.0 MW
Turbine Type Francis
Gross Head 155 m
Net Head 148 m
Design Flow 7.0 m³/s
Annual Energy 38.5 GWh
Penstock Length 2,700 m
Catchment Area 67 km²
Turbine Efficiency 92%
Generator Efficiency 95%
📊 Project Milestones

Summary of Accomplishments

Key milestones achieved as of December 2025 across technical, legal, and financial domains.

Technical

Engineering & Survey

  • Pre-Feasibility Study (PFS) completed
  • Detailed Hydrology & Geotechnical Study
  • Topographic & Watershed Mapping
  • Engineering Design (Intake, Penstock, Powerhouse)
  • Google Earth scheme & DOE PRS92 survey approved
📄
Legal & Regulatory

Permits & Compliance

  • DOE Service Contract SC-2020-04-0013 awarded
  • SEC Registration CS202060596
  • LGU endorsements (Nagtipunan & Dupax del Norte)
  • NCIP Certification Precondition (CP) application
  • Community FPIC consultations completed
  • ECC Environmental Compliance Certificate
💰
Financial

Investment & Funding

  • USD $35M Investment Facility secured (SVG)
  • 5-Tranche Equity drawdown structure defined
  • Land Bank of the Philippines Relationship Manager assigned
  • ₱20M 3-Year Pre-Construction Work Plan budgeted
  • Board Resolutions & Corporate Governance established

🎯 Next Milestone: Full EPC Commencement

Upon release of NCIP Certification Precondition and final ECC clearance, the project advances to full Engineering, Procurement & Construction (EPC) phase, unlocking the first tranche of the $35M investment facility through Silicon Valley Global PH.

🗺 Engineering & Design

Project Scheme Explorer

Navigate through satellite imagery, official DOE surveys, watershed analysis and engineering plans of the 8 MW facility.

Google Earth Scheme
🛰 Satellite Imagery

Google Earth Project Overlay

Aerial view of the Laconwap 3 scheme showing the intake dam at elevation 600m ASL, the 2.7 km penstock alignment following river contours, and the powerhouse at 445m ASL in Nagtipunan, Quirino.

Intake Elevation
600 m ASL
Powerhouse Elev.
445 m ASL
Penstock Length
2,700 m
Gross Head
155 m
💧 How It Works

Run-of-River Hydropower Process

01
💧

Water Intake

River water is diverted at 600m ASL through a weir dam and headrace channel into the penstock system.

02
🔄

Penstock Flow

Water flows through a 2.7 km steel penstock, gaining kinetic energy as it drops 155m in elevation.

03

Power Generation

High-pressure water spins twin Francis turbines at 750 RPM, driving generators producing 8 MW of clean electricity.

04
🌍

Grid Distribution

Electricity is stepped up to 69 kV and fed into the Luzon grid via a dedicated transmission line to power Northern Luzon.

📊 Hydrology & Power

Technical Specifications

Detailed engineering parameters from the Pre-Feasibility Study with an interactive power output calculator.

⚡ Project Parameters

Project NameLaconwap 3 MHPP
Rated Capacity8.0 MW
Turbine TypeFrancis (Horizontal)
Number of Units2 × 4 MW
Gross Head155 m
Net Head148 m
Design Flow (Q)7.0 m³/s
Penstock Length2,700 m
Penstock Diameter1.2 m
Turbine Efficiency92 %
Generator Efficiency95 %
Transformer Efficiency97.2 %
Catchment Area67 km²
Annual Energy Output38.5 GWh

🧮 Power Output Calculator

Adjust flow rate and head to simulate power generation for the Laconwap 3 MHPP.

Flow Rate (Q) 7.0 m³/s
Net Head (H) 148 m
Overall Efficiency (η) 84.96%
Estimated Power Output
8.63 MW

P = (7.0 × 148 × 9.81 × 0.8496) / 1000

📈 Financial Blueprint

3-Year Plan & Investment Facility

₱20M pre-construction work plan with USD $35M equity investment facility structured in 5 tranches through Silicon Valley Global PH.

ActivityCost (₱)
Updated Topographic Survey (LIDAR)1,800,000
Geotechnical Drilling & Analysis1,200,000
Updated Hydrology Study800,000
EIS / ECC Application1,500,000
NCIP CP Processing500,000
Project Management Office350,000
ActivityCost (₱)
Detailed Engineering Design (DED)3,500,000
Electromechanical Design1,200,000
Transmission Line Design800,000
Financial Modeling & PPA Negotiation1,000,000
Legal & Regulatory Compliance1,000,000
Administrative & Contingency800,000
ActivityCost (₱)
EPC Contractor Procurement1,500,000
Access Road & Site Preparation1,500,000
Community Development Fund800,000
Equipment Deposits & Procurement1,000,000
Final Contingency & Reserves750,000
🏦 Silicon Valley Global PH

USD $35M Investment Facility

Equity Investment Agreement providing staged capital deployment across 5 tranches, managed through Land Bank of the Philippines.

Tranche 1 Initial development & pre-construction activities $5,000,000
Tranche 2 Detailed engineering design & site preparation $7,000,000
Tranche 3 Equipment procurement & civil works commencement $8,000,000
Tranche 4 Electromechanical installation & testing $8,000,000
Tranche 5 Commissioning, grid connection & working capital $7,000,000
Total Investment Facility $35,000,000
🏢 Corporate Structure

Governance & Partners

A multi-stakeholder partnership combining indigenous community leadership, engineering expertise, and international investment.

🏗

NLCDCInc.

EPC Contractor

Northern Luzon Construction & Development Co. — Engineering, Procurement & Construction partner with regional expertise.

💎

SVG PH

Investment Partner

Silicon Valley Global Philippines — USD $35M equity investment facility providing staged capital deployment for the project.

🏦

Land Bank

Banking Partner

Land Bank of the Philippines — Government financial institution managing the Relationship Manager Account (RMA) for fund administration.

DOE

Regulatory Authority

Department of Energy — Awarded Service Contract SC-2020-04-0013 for the development and operation of the 8 MW facility.

Leadership Team

MD

Max Duguiang

Chairman of the Board

LGEI

HM

Engr. Hendrick Manegdeg

Co-President

NLCDCInc.

SK

Sazzad Khan

Director / Investor

SVG PH

JW

Jonathan Wag-e

Community Representative

Indigenous Peoples

📁 Documentation

Key Documents

📊

Summary of Accomplishments

As of December 2025 — NLCDC & LGEI

Comprehensive report covering technical PFS, geological assessment, DOE service contracts, and financial plans.

🏦

LBP RMA Account Request

Land Bank of the Philippines

Relationship Manager Account request for institutional administration of the USD $35M investment facility fund flows.

📜

Equity Investment Agreement

SVG PH — LGEI $35M Facility

Silicon Valley Global Philippines equity investment facility defining the staged 5-tranche capital drawdown framework.

📬 Get in Touch

Contact LGEI

Interested in the Laconwap 3 Mini-Hydro Power Project? Reach out for investment inquiries, partnership opportunities, or technical information.

Laconwap Green Energy Inc.

Registered under SEC CS202060596 as a renewable energy project developer focused on run-of-river hydroelectric power in Northern Luzon, Philippines.

📱
Mobile / WhatsApp
✉️
📍
Project Site
Nagtipunan, Quirino &
Dupax del Norte, Nueva Vizcaya
Philippines
🌐
Website
www.laconwap.com

Send an Inquiry

Message sent successfully!